Scaffolding Highlights

The St. Regis Toronto

  • Provide formwork for slabs infill where hoist was installed
  • Provide access to 32+33rd floor balconies for cladding and soffit installation
  • All scaffold suspended
  • Provided access via a cantilevered scaffold to the 57th floor for galvanizing and roof work
  • Provided sidewalk protection over glass canopy

Temporary Warehouse Enclosures

  • 90′ wide x 50′ high x 500′ long
  • maintained a minimum 5 degrees Celsius for concrete forms

Eaton Centre, Toronto - Nordstrom

  • Client required windows to be clear
  • Scaffolding was custom powder coated to match company branding

Restorations

  • Heavy stone facade removed and remained on scaffold
  • Complete enclose for lead abatement measures

Minor projects

  • Garbage chutes
  • Exclosure system with lexan panels
  • Free standing stair towers
  • Swing stage
  • Walkthrough overhead protection