The St. Regis Toronto
- Provide formwork for slabs infill where hoist was installed
- Provide access to 32+33rd floor balconies for cladding and soffit installation
- All scaffold suspended
- Provided access via a cantilevered scaffold to the 57th floor for galvanizing and roof work
- Provided sidewalk protection over glass canopy
Temporary Warehouse Enclosures
- 90′ wide x 50′ high x 500′ long
- maintained a minimum 5 degrees Celsius for concrete forms
Eaton Centre, Toronto - Nordstrom
- Client required windows to be clear
- Scaffolding was custom powder coated to match company branding
Restorations
- Heavy stone facade removed and remained on scaffold
- Complete enclose for lead abatement measures
Minor projects
- Garbage chutes
- Exclosure system with lexan panels
- Free standing stair towers
- Swing stage
- Walkthrough overhead protection